Attain for Industrial

Warehouse ventilation
Site 014
2h 30m
Beyond the agreed shift schedule
00:00
24:00
Scheduled end
19:30
Actual stop
22:00
Review schedule ↗
Make non-production hours count.
Warehouses, offices and support spaces do not always need the same service levels as production. Compare agreed schedules with actual HVAC and lighting operation, then investigate equipment running beyond approved shifts or maintenance windows.
Find cooling problems before they spread.
A high supply-air temperature can affect several occupied areas. Attain brings the equipment and conditions together with supporting evidence, helping engineers investigate the cooling unit and check the result after work.
AHU-01
Site 014
Cooling not meeting demand
COOLING DEMAND
100%
SUPPLY AIR TEMP
25°C
Affected spaces
Target 23°C
ZONE 1
Dispatch office
25.8°C
ZONE 2
Packing area
25.4°C
Inspect cooling unit
Site demand forecast
Today · Demand (kW)
400
300
200
100
0
00:00
06:00
12:00
18:00
24:00
Observed
Unadjusted
ActiveTrim
Now · 13:00
300 kW limit
Manage demand around the way you operate.
Starting equipment and supporting plant together can create a demand peak. ActiveTrim anticipates demand and adjusts enabled building services within agreed operational and equipment limits, with critical process requirements built into the strategy.
Find systems working against each other.
Simultaneous heating and cooling can waste energy in offices and support areas. Bring the equipment commands and temperatures together so engineers can investigate the control sequence while production requirements remain protected.
SITE 014 · AHU-01
Heating and cooling overlap
HEATING
80%
Valve command
COOLING
75%
Valve command
Dispatch office · Target 22°C
23.5°C
Genie · Investigate control sequence ↗
Performance over time
Weekly energy · Baseline = 100
120
100
80
60
Wk 1
Wk 2
Wk 3
Wk 4
Wk 5
Baseline
Actual
Week 3 · Shift schedule adjusted
Prove what changed after the shift.
Compare energy and operational trends against an agreed baseline. Keep interventions linked to the site and account for shift patterns and production where appropriate data is available.
How it Works
Related
Got questions?
Here's answers.
Give us a site.
We'll find the starting point.
Tell us about your facilities, systems and operational priorities. Attain engineers will assess the available data and identify a practical starting point.