Attain for Facilities & Engineering Teams
AHU-02 cooling valve
not following its command.
Open command
Position feedback
Serving two affected spaces
Meeting Room 2 · VAV-204
26.0°C
Office 2 · VAV-206
25.6°C
Inspect valve, actuator and feedback
Investigate related symptoms together. Attain links the affected spaces to their serving equipment and checks operating evidence before recommending an intervention. A valve command that disagrees with position feedback becomes a focused investigation, rather than another unexplained temperature alarm.
Move from a room to its terminal unit, air handler and plant. Compare trends, setpoints and operating states in one place. Ask Genie about a change in performance and use the underlying evidence to test the explanation.
Why did AHU-03 start before 05:00?
A manual override is
extending operation.
The fan started at 04:55. Its occupied schedule starts at 08:00, and the manual-on override is still active.
AHU-03 fan status
Running
Manual-on override
Active
Action A-204
Ready for review
Inspect the cooling
valve assembly.
AHU-02 · Level 2
Priority
High
Responsible team
HVAC team
Supporting evidence
Command ≠ feedback
Check valve travel, actuator operation and the feedback signal. Record the finding before choosing the repair.
Review action and evidence
Put the finding, affected equipment and proposed action in the same workflow. Teams can review priority, assign responsibility and record the intervention. A technician starts with the evidence that matters, and the next person can see what has already been done.
ActiveTrim coordinates approved schedules, setpoints and system logic around changing demand. Engineers define the limits for comfort, plant and operating requirements, then review what changed. Routine adaptation can continue without losing the distinction between a control command and a maintenance action.
Latest control changes
14:10
CHW supply target
7.0 → 8.0°C
13:45
AHU-03 start offset
0 → 5 min
Comfort limits
21–24°C
AHU-02 · cooling valve
Valve response restored
Before repair
100% command
0% feedback
Following period
100% command
100% feedback
Room response
Back within target
A closed action does not prove an equipment problem has gone away. Check command and feedback, compare following-period trends and watch for recurrence. Attain keeps the performance evidence alongside the work, so you can see whether the intervention restored the expected behaviour.
How it Works
We already have BMS alarms. What does Attain add?
Can we inspect the evidence behind a recommendation?
Does Attain replace our engineers or contractors?
What access is needed to our controls?
How is ActiveTrim kept within our operating requirements?
How do we know a fix has worked?
Give your team
a better starting point.
Show us the systems you maintain and the issues that keep coming back. We’ll assess the data and identify where connected diagnostics and control can help.